So that the construction made of plasterboard and metal posts also holds together properly, certain distances must be observed. For example, there is the distance between the upright metal profiles. It must not be larger than 62,5 cm! Care must be taken when screwing the floor profiles, that with straight profiles at least all 100 cm a screw connection is set. With the slotted metal profile from the side 16 (picture 2) should it all 25 be cm. The gypsum boards themselves are secured with screws spaced by 25 cm screwed to the metal profiles.

CUTTING WITH RAIL AND CUTTER KNIFE

1 Das Zuschneiden der Platten erfolgt mit einem Cutter- or box cutter and a metal rail or spirit level. First score the front side of the panel along the desired line.

2 Dann brechen Sie die Platte mit leichtem Druck oder einem Schlag.

3 Anschließend durchtrennen Sie ebenfalls mit dem Cuttermesser den Karton der Rückseite.

 

FILLING JOINTS AND EDGES

1 Alle freistehenden Kanten werden mit Eckschutzschienen geschützt. They are embedded in filler and carefully smoothed over.

2 Die Schraubenköpfe werden ebenfalls verspachtelt.

3 Die Fugen zwischen den einzelnen Platten nach Herstellerangaben mit Spachtelmasse und Bewehrungsstreifen verspachteln. Sand clean after drying.