Before you really get started, you should first draw up a precise floor plan of your building project, because she helps, to record the correct position of the metal profiles on the floor.
You then need the material: one about 3 cm thick table top 141 x 135 cm, a batten 3 x 5 cm as a side support for the table top, four YOUR Profile 50 mm of length 2 m, six CW profiles 50 mm with a minimum length of 2,1 m, 3,5 sqm mineral wool (50 mm dick) as insulation, at least 7 sqm (this is where the cut comes in) von 6,5 mm thick plasterboard, four length corner guard rails 2,1 m as well as joint filler and reinforcement strips. In addition, screws t and dowels for wall and floor mounting, drywall screws with 25 mm and 45 mm length and electric cable, three lights and luster terminals, Wall paint and primer for plasterboard.
YOU NEED IT.
Is crucial for the hold of the gypsum boards, that the screw heads do not damage or even pierce the cardboard layer. A bit holder with screw depth adjustment is helpful here. It limits the screw-in depth of the screw, that it sits flush with the plasterboard surface. You will also need crimping pliers. This punching and notching pliers for metal profiles cuts two parallel notches in the overlapping profiles in one step and at the same time flanges the resulting tongue.
1 An den UW-Profilen zuerst je einen Schenkel und den Mittelsteg im Abstand von 5 cut in cm, so that the profile can be perfectly adapted to the desired curve.
2 Nun das erste UW-Profil mit Schrauben und Dübeln am Fußboden befestigen. Start on one side and then follow the curve you have drawn. The upright CW profiles are then cut to size.
3 Stellen Sie die CW-Profile in das gebogene Bodenprofil. The long CW profiles are placed on the outside and the two short ones in between. Attach the second cut UW profile from above. All connections are fixed with the crimping pliers. (See photo 5). Then saw the recesses and the front curve in the table top and screw them to the UW profile from below.
4 + 5 Is the table top mounted?, the upper part is set up in the same way.
6 Die Dämmung, which has a sound-absorbing effect here, cut and pinch.
7 + 8 Bend gypsum boards carefully to the metal post and fix with drywall screws.