Elegant floor made entirely of wood

Whether ship floor pattern or mosaic sticks: Ready-made parquet made of fine woods suits every furnishing style.

The old principle, that wood works, only applies to a very small extent to modern ready-made parquet. The carrier material of this high-quality floor covering consists of several layers glued together like plywood and one carefully selected one, that. 4 mm thick face veneer. With the surface-sealed ones, Ready-made parquet floorboards with tongue and groove all around can be used with different types of wood, e.g. B. Oak, Lures, Choose beech or maple. And you can choose between a face veneer covering the full width of the plank, the ship bottom type, in which the veneer consists of three wide bars, or the mosaic of narrow, bars joined together like a cube. The floorboards are laid floating, Glutos. h. without contact with the walls, on a thin impact sound insulation film.

We have put together the right tools for laying floors for you here. The specialists: Knocking log and pulling iron. Floating, without solid contact with the ground, the plank lies on a thin insulating mat. Wedges an edge of 1,5 fix cm. One plank follows the next as a flowing bond. The remainder of the first row of planks always forms the beginning of the next. The parquet glue is only placed in the grooves on the sides of the plank. Then firmly attach the groove to the tongue of the previously laid board. Mit Hammer und Klopfscheit
take care, that the glue joints on the longitudinal- and close the short side without gaps. Wipe off glue residue. You have to adjust the floorboards exactly, where pipes or sockets interfere. Fill the gap from a scrap wood with matching veneer. Mark out the last board: You lay them flush on the floor, then a plank in contact with the wall. leading edge: Mark cutting line. The last plank is inserted with the pull bar. You put them on the spring at an angle, hook the pull bar and tap them tight. The skirting boards are installed, after removing the wooden wedges. Adjust bars, then fasten with dowels and screws. You can achieve a clean transition to the next room with profile rails. Unscrew and cover with a plastic profile.