Concrete floor in mica look

With the coating system from Coelan you kill two birds with one stone. They create an attractive surface and make it resistant.

1 After patching cracks and thorough cleaning, a primer is applied. It serves to strengthen the surface and as a primer for the coating.

2 After about six hours you can apply the color evenly with a mohair roller.

3 Small chips (or quartz sand) are sprinkled into the still wet paint mass.

4 The paint is dry after six to eight hours, and the clear coating can be applied. This is followed by a matte seal.

Leave a Reply

Your email address will not be published. Required fields are marked *